Stop Paying Taxes on Utilities
QUALIFICATION REQUIREMENTS
The Texas Comptroller's Office allows companies located
in Texas engaged in manufacturing to purchase natural gas
and electricity tax free. In order to qualify, a manufacturer
must maintain proof of their eligibility in the form of a
valid "Predominant Use Study" performed by a certified engineer.
Natural gas or electricity used during a regular
monthly billing period for both exempt and taxable purposes
under a single meter is either totally exempt or taxable based
upon the predominant use of the natural gas or electricity
measured by that meter. A study is performed to establish
what percentage is being used for exempt purposes as defined
by the Texas Comptroller. Additionally, current law allows
the taxpayer to apply for a refund of all sales tax paid over
the preceding 48 months or since the meter was connected,
whichever is less. The study must be completed and on file
at the location of the entity claiming the exemption at the
time an exemption certificate is submitted to the utility
company.
Each meter is evaluated independently from any
other meters and must stand up to scrutiny. Equipment cannot
be deleted or allocated so as to ensure qualification.
Although the study does not carry an expiration
date, it should be updated anytime a "significant change"
is made affecting that meter.
Without the study, the claim for exemption will be presumed
to be invalid. Persons obtaining a sales tax refund or not
paying sales tax without a valid study will be assessed tax
penalty, and interest by the Texas Comptroller on the full
amount of the refund or amount of the assessment, if the exemption
is not proved.
Our team of certified engineers and former Texas tax
auditors will analyze annual consumption, compile data, compute
percentages, prepare documentation, and certify results. There
is no disruption of your daily operations during this process.
We complete and submit all necessary documentation to support
our studies and as needed, defend them against the Texas Comptroller's
office. If you are paying sales tax on utilities and your
competitors are not, they have the advantage!
To prepare your study, we will need the following documents:
· A signed engagement agreement
· A utility company required, limited power of attorney.
· Copies of the last 12 paid utility bills for each meter.
Typically, our fees are calculated on a percentage of the
tax recovered from the State. We believe this type of arrangement
is appropriate since fees will be based solely qualifying
meters. We also provide flat fee update studies for those
companies who desire to maintain their current exempt status
after a significant change has altered the allocation of a
meter.
Dan Martinez & Associates has never had a predominant
use study overturned by the Texas Comptrollers office.
For more information about our services, please
contact us.
|